No power shortage despite 2 Ropar units down: Sond
Chandigarh: Punjab faced no power shortage despite two units of the Guru Gobind Singh Super Thermal Plant , Ropar , with a combined capacity of 150 MW, being non-functional, power minister Tarunpreet Singh Sond said on Tuesday.
Sond said one of the units would be operational by Wednesday morning and the other within a few days. He said no shortage-related power cuts were imposed anywhere in the state.

Punjab met a demand of 16,268 MW on September 12, 16,455 MW on September 13 and 17,281 MW on September 14, with the latter being the highest-ever demand met by the state, Sond said.
“Despite two units being down, there was no power shortage in the state,” he said.
Sond said one of the units would be operational by Wednesday morning and the other within a few days. He said no shortage-related power cuts were imposed anywhere in the state.
Punjab met a demand of 16,268 MW on September 12, 16,455 MW on September 13 and 17,281 MW on September 14, with the latter being the highest-ever demand met by the state, Sond said.
“Despite two units being down, there was no power shortage in the state,” he said.
Next Story